top of page

Updated 7/8/2025
FOOD SURVEY
May 23-25 Work Weekend
Spring Work Weekend 2025
Work Detail
- Chimney Liner to be installed by North Country Hearth and Home on 5/8-9.
- Clean Cabin; shop vac, windows, cupboards
- Rework kitchen cabinets adding two new steel cabinets*
(*May opt to perform this work at a different time due to food prep needs for WW)
- New kitchen faucet and connect to the water line.
- Clean/Organize Outhouse & Woodshed
- Repair/Add shingles to dormers.
- Check repairs made to dormer roofs to make sure they are still holding.
- General outdoor cleanup, make sure drives are clear/widened, etc.
- Reload woodshed.
-Finish splitting wood and load woodshed (if we have a crew, otherwise moves to fall)
bottom of page